Project Description

Client: Chaparrel Middle School
Location: Diamond Bar, CA
Buildings: Permanent Modular Gymnasium
Square Footage: 8,575 ft2
Year Completed: 2010

Project Overview

For Modus Systems, Inc., having been chosen to turn this dream project into a reality was both a great honor and a highly focused undertaking. The new 8,600 sq. ft. multi-purpose facility was completed after 9 months of construction and was celebrated as a resounding success at a grand opening and ribbon cutting ceremony.

Result

In addition to the main basketball court with motorized equipment and wall padding at each backstop, this state-of- the-art gym also includes two practice basketball courts. The main volleyball court also has two practice volleyball courts and floor sleeves for the volleyball equipment. There are two wireless scoreboards, a complete sound system with wireless microphone, an LCD projector and a large LCD projector screen. 25 skylights provide natural lighting and conserve energy throughout the day.

Two sets of motorized bleachers seat approximately 318 people. As the brand that is Redefining Modular ™, Modus Systems is especially proud of the 8 foot high by 80 foot long rock climbing wall with rubber matting at its base to prevent injuries to climbers

Our Projects