Fresh Start Charter School Gymnasium

Todays Fresh Start Charter School Gymnasium

Project Description

Client: Todays Fresh Start Charter School
Location: Los Angeles, CA
Square Footage: 10,000 ft2
Year Completed: 2016

Project Overview

New Gymnasium for Todays Fresh Start Charter School in Los Angeles.

Our Projects

CABRILLO MIDDLE SCHOOL PRE-FABRICATED MODULAR ADMINISTRATION BUILDING

Cabrillo Middle School Pre-Fabricated Modular Administration Building

Project Description

Client: Cabrillo Middle School
Location: CA
Buildings: Administration Building
Square Footage: ?? ft2
Year Completed: 2013

Project Overview

More info coming soon.

Our Projects

Coming Soon

Chaparral Music & Kitchen Service Building

Project Description

Client: Chaparral Middle School
Location: Diamond Bar, CA
Buildings: Multi-Purpose Building, Music, Full Service Kitchen, & Service Building
Square Footage: 14,171 ft2
Year Completed: 2015

Project Overview

Work has been completed on the new $5 million Music Building (10,255 sq. ft.) and Food Service Building (3,916 sq. ft.) at Chaparral Middle School.

Photos coming soon.

Our Projects

Pomeroy Elementary MPR Building

Pomeroy Elementary MPR Building

Project Description

Client: Pomeroy Elementary School
Location: Milpitas, CA
Buildings: Multi-Purpose Building
Square Footage: 6,000 ft2
Year Completed: 2014

Project Overview

The new 6,000sf single-story building is a pre-fabricated modular building. The new building is equipped with a raised stage that can fit an entire class with nice lighting and a sound system. The building also includes a warming kitchen and a speed line to quickly serve food to the students. ACEE worked closely with the Architect and Milpitas district on the district standards and the usage of the building. The overall construction for this project was smooth with less than 10 RFIs.

Our Projects

Tioga High School Modular Gymnasium

Tioga High School Gymnasium

Project Description

Client: Tioga High School
Location: Big Oak Flat, CA
Square Footage: 12,573 ft2
Year Completed: 2008

Project Overview

A gymnasium, kitchen, and locker room designed and constructed for Groveland Unified School District in 2008.

Our Projects

Parras Middle School Gymnasium

Parras Middle School Gymnasium

Project Description

Client: Parras Middle School
Location: Redondo Beach, CA
Buildings: Permanent Modular Gymnasium, Stage & Workout Room
Square Footage: 10,982 ft2
Year Completed: 2010

Project Overview

Modus Systems, Inc. takes great pride in having designed and built the gymnasium and multi-purpose room that help make this extraordinary achievement possible. Working with the school’s architects, Modus was able to construct a gymnasium that was true to Parras Middle School’s singular vision for an elite, multi-purpose athletic facility.

Working with the school’s architects, Modus was able to construct a gymnasium that was true to Parras Middle School’s singular vision for an elite, multi-purpose athletic facility.

Result

Of all the modular builders Parras could have chosen for their dream project, Modus, the brand that has ‘redefined modular’, was the clear choice for their unique ability to configure a custom floor plan consistent with the school’s innovative concept.

At the center of this sparkling new facility is an 11,000 square foot gym, with its own March Madness tournament, and ‘game on’ all year long. In an attached fitness center, students move through circuits that include weight stacks, dumbbells, a rotating rock wall, boxing, cardio machines, functional training with medicine balls and balance equipment.

Our Projects

Luther Burbank USD Modular Gymnasium

Luther Burbank USD Gymnasium & MPR

Project Description

Client: Luther Burbank USD
Location: San Jose, CA
Buildings: Permanent Modular Gymnasium, Kitchen, Serving Line, Stage that opens up into the outside quad area, Restrooms and Storage
Year Completed: 2009

Project Overview

Luther Burbank, a one school district, received a Modus System Multipurpose Room from the passing of measure A. This measure providing : A multipurpose room & cafeteria for the school’s use and for the local community to use as well.

Our Projects

Adams Middle School Gymnasium

Adams Middle School Gymnasium

Project Description

Client: Adams Middle School
Location: Redondo Beach, CA
Buildings: Permanent Modular Gymnasium, MPR Building
Square Footage: 9,775 ft2
Year Completed: 2010

Project Overview

This was the challenge faced by the Redondo Beach Unified School District as they sought to have a new multi-purpose facility designed and built for Adams Middle School. Yes, they wanted a gymnasium with all of the usual bells and whistles. But beyond that, they wanted an inspired, multi-purpose design, which in the words of Adams Middle School, would provide students with “a meaningful recreational experience regardless of ability, inability or disability”.

Nothing less would do. And that’s why for this very challenging project, the Redondo Beach Unified School District chose Modus Systems, the brand that has Redefined Modular ™.

Result

Today, the multi-purpose gymnasium Modus designed and built for Adams Middle School has immersed the entire student body in a wide range of indoor sporting activities and other recreational interests.

Full court basketball, volleyball, badminton and intramural sports are all in full swing before, between, and after classes. Add to that the ability to stage school functions, such as assemblies and theatrical productions, and it’s no surprise that this proud new facility has become the hub of the Adams Middle School campus.

Our Projects