Temple Elementary Modular Gymnasium

Temple Intermediate School Gymnasium

Project Description

Client: Temple Intermediate School
Location: Rosemead, CA
Square Footage: 8,000 ft2
Year Completed: 2007

Project Overview

One of two gymnasiums completed for the Garvey Unified School District.

Our Projects

Garvey Modular Gymnasium

Garvey Intermediate School Gymnasium

Project Description

Client: Garvey Intermediate School
Location: Rosemead, CA
Square Footage: 8,000 ft2
Year Completed: 2007

Project Overview

One of two gymnasiums completed for the Garvey Unified School District.

Our Projects

Don Pedro High School Modular Gymnasium

Don Pedro High School Gymnasium

Project Description

Client: Don Pedro High School
Location: Groveland, CA
Buildings: Gymnasium, Kitchen, Locker Rooms
Square Footage: 12,573 ft2
Year Completed: 2009

Project Overview

Modus Systems, Inc. designed and constructed Gymnasium, Kitchen, and Locker Room buildings for Don Pedro High School of the Groveland Unified School District in Groveland, CA.

Our Projects

Tioga High School Modular Gymnasium

Tioga High School Gymnasium

Project Description

Client: Tioga High School
Location: Big Oak Flat, CA
Square Footage: 12,573 ft2
Year Completed: 2008

Project Overview

A gymnasium, kitchen, and locker room designed and constructed for Groveland Unified School District in 2008.

Our Projects

Parras Middle School Gymnasium

Parras Middle School Gymnasium

Project Description

Client: Parras Middle School
Location: Redondo Beach, CA
Buildings: Permanent Modular Gymnasium, Stage & Workout Room
Square Footage: 10,982 ft2
Year Completed: 2010

Project Overview

Modus Systems, Inc. takes great pride in having designed and built the gymnasium and multi-purpose room that help make this extraordinary achievement possible. Working with the school’s architects, Modus was able to construct a gymnasium that was true to Parras Middle School’s singular vision for an elite, multi-purpose athletic facility.

Working with the school’s architects, Modus was able to construct a gymnasium that was true to Parras Middle School’s singular vision for an elite, multi-purpose athletic facility.

Result

Of all the modular builders Parras could have chosen for their dream project, Modus, the brand that has ‘redefined modular’, was the clear choice for their unique ability to configure a custom floor plan consistent with the school’s innovative concept.

At the center of this sparkling new facility is an 11,000 square foot gym, with its own March Madness tournament, and ‘game on’ all year long. In an attached fitness center, students move through circuits that include weight stacks, dumbbells, a rotating rock wall, boxing, cardio machines, functional training with medicine balls and balance equipment.

Our Projects

Luther Burbank USD Modular Gymnasium

Luther Burbank USD Gymnasium & MPR

Project Description

Client: Luther Burbank USD
Location: San Jose, CA
Buildings: Permanent Modular Gymnasium, Kitchen, Serving Line, Stage that opens up into the outside quad area, Restrooms and Storage
Year Completed: 2009

Project Overview

Luther Burbank, a one school district, received a Modus System Multipurpose Room from the passing of measure A. This measure providing : A multipurpose room & cafeteria for the school’s use and for the local community to use as well.

Our Projects

Chaparral Middle School Gymnasium

Chaparral Middle School Gymnasium

Project Description

Client: Chaparrel Middle School
Location: Diamond Bar, CA
Buildings: Permanent Modular Gymnasium
Square Footage: 8,575 ft2
Year Completed: 2010

Project Overview

For Modus Systems, Inc., having been chosen to turn this dream project into a reality was both a great honor and a highly focused undertaking. The new 8,600 sq. ft. multi-purpose facility was completed after 9 months of construction and was celebrated as a resounding success at a grand opening and ribbon cutting ceremony.

Result

In addition to the main basketball court with motorized equipment and wall padding at each backstop, this state-of- the-art gym also includes two practice basketball courts. The main volleyball court also has two practice volleyball courts and floor sleeves for the volleyball equipment. There are two wireless scoreboards, a complete sound system with wireless microphone, an LCD projector and a large LCD projector screen. 25 skylights provide natural lighting and conserve energy throughout the day.

Two sets of motorized bleachers seat approximately 318 people. As the brand that is Redefining Modular ™, Modus Systems is especially proud of the 8 foot high by 80 foot long rock climbing wall with rubber matting at its base to prevent injuries to climbers

Our Projects

Adams Middle School Gymnasium

Adams Middle School Gymnasium

Project Description

Client: Adams Middle School
Location: Redondo Beach, CA
Buildings: Permanent Modular Gymnasium, MPR Building
Square Footage: 9,775 ft2
Year Completed: 2010

Project Overview

This was the challenge faced by the Redondo Beach Unified School District as they sought to have a new multi-purpose facility designed and built for Adams Middle School. Yes, they wanted a gymnasium with all of the usual bells and whistles. But beyond that, they wanted an inspired, multi-purpose design, which in the words of Adams Middle School, would provide students with “a meaningful recreational experience regardless of ability, inability or disability”.

Nothing less would do. And that’s why for this very challenging project, the Redondo Beach Unified School District chose Modus Systems, the brand that has Redefined Modular ™.

Result

Today, the multi-purpose gymnasium Modus designed and built for Adams Middle School has immersed the entire student body in a wide range of indoor sporting activities and other recreational interests.

Full court basketball, volleyball, badminton and intramural sports are all in full swing before, between, and after classes. Add to that the ability to stage school functions, such as assemblies and theatrical productions, and it’s no surprise that this proud new facility has become the hub of the Adams Middle School campus.

Our Projects

Delta Charter High School Modular Gymnasium

Delta Charter High School Gymnasium

Project Description

Client: New Jerusalem School & Delta Charter High School
Location: Tracy, CA
Buildings: Permanent Modular Gymnasium Building, Attached Modular Lobby Building, Ticket Booth, AV Room, Exterior Self Contained Water Tank Building
Square Footage: 10,000 ft2
Year Completed: 2012

Project Overview

Not only would this need to be a multi- purpose gymnasium in the truest sense of that term, it would have to serve the needs of not just one school, but two: New Jerusalem Elementary School and Delta Charter School, both on the same campus. In addition, the project would include the design and construction of four new classrooms.

Ironically, all of the elements that made this project so unique led to the inevitable selection of Modus Systems, Inc., the brand that has Redefined ModularTM construction, as the most qualified designer and builder of gym- nasiums and multi-purpose rooms to undertake it.

Result

Working closely with New Jerusalem’s team of architects, Modus designed and built an 10,000 square foot gymnasium,

with an attached tank and lobby building for ticket sales and an impressive display area for trophies. Skylights create a feeling of expansiveness for boys and girls basketball, volleyball, assemblies, piano recitals, theatrical productions, and more.

Also available to students is an AV room, where students have the opportunity to learn to do video production of sporting events, including instant replay. And both schools take great pride in seeing both their logos on two different sides of the building.